Downstream-References
Projects 2004-Today | Projects 2000 - 2004 | Projects 1989 - 1999

-
Basic Engineering
Detail Engineering
Procurement (Support)
Erection (Supervision)
Commissioning
Qualification (IQ, OQ)
ROCHE DIAGNOSTICS - Germany | 2008
Umbau Biologics IV (B4X)
Project completion time: 9 months
Vogelbusch Biopharma was contracted to remodel Production Line 2 in the Biologics IV Building. The remodeling was necessary on account of a product conversion.

-
Detail Engineering
Procurement
Erection (Supervision)
Commissioning (Support)
Qualification (IQ, OQ)
ROCHE DIAGNOSTICS - Germany | 2008
Pufferansatztechnikum und Downstreamlinie (1K5)
Project completion time: 18 months
Vogelbusch Biopharma was contracted to deliver a buffer preparation tech center and a down stream line for the Production Facility 352.
...mehr

-
Concept study
BAXTER AG - Austria | 2008
CONCEPT STUDY VACCINE ORTH (LE2)

-
Basic Engineering
BAXTER AG - Austria | 2008
SINGAPORE VACCINE (SGV)

-
Basic Engineering
Detail Engineering
Procurement
Erection (Supervision)
Commissioning
IQ-, OQ- Support
LONZA Ltd - Switzerland | 2007
Fermentation, Harvesting & Downstreamprocessing for a microbial Multi- Purpose Plant (LSN)
Downstream-References


-
Basic Engineering
LONZA Ltd - Switzerland | 2007
Large Scale & High throughput Microbial Production Plant (BMX)

-
Basic Engineering
Detail Engineering
Procurement
Erection (Supervision)
Commissioning
Qualification (IQ, OQ, Support)
LONZA Biotec sro - Czech Republic | 2007
Refit & Expansion for a Fermentation, Harvesting & Downstream Plant (ALT)
Project completion time: 18 months
The project in Kourim (Czech Republic) consisted of upgrading or expanding the production capacities of three buildings (F3, KUP15, and Premix).

-
Detail Engineering
Support
Commissioning
Qualification (IQ, OQ)
LONZA Biotec sro - Czech Republic | 2007
Large Scale Chromatographyskids for LPLC Process Step (ALC)

-
Detail Engineering
Procurement
Erection (Supervision)
Commissioning (Support)
Qualification (IQ, OQ)
ROCHE DIAGNOSTICS - Germany | 2007
Biologics IV Downstream - (B4D)
Project completion time: 24 months
Vogelbusch Biopharma was contracted to provide two downstream facilities for the new Biologics IV biotechnological production facility. This plant purifies the active pharmaceutical ingredient trastumzumab (monoclonal antibody, trade name Herceptin®).

-
Detail Engineering
Procurement
Erection (Supervision)
Commissioning (Support)
Qualification (IQ, OQ)
ROCHE DIAGNOSTICS - Germany |
REACTOR FOR PROTEIN COATING ON BEADS - (B4A)
Project completion time: 10 months
Delivery of a bead coating facility. The facility is used for preparing and coating beads (polystyrene balls ca. 2.7 µm in diameter) with proteins, as well as for filling them.
Downstream-References


-
Detail Engineering
Procurement (Support)
Commissioning
Qualification (IQ, OQ)
LONZA Ltd - Switzerland | 2004
Fermentation and Harvesting for a Multi- Purpose Plant - (BPM SS)
Project completion time: 13 months
We signed a contract for the design, construction, and startup of a microbial fermentation plant for Lonza at their Visp production facility.