Concept study
BAXTER AG - Austria | 2008
CONCEPT STUDY VACCINE ORTH (LE2)

-
Basic Engineering
BAXTER AG - Austria | 2008
SINGAPORE VACCINE (SGV)

-
Basic Engineering
Detail Engineering
Procurement
Erection (Supervision)
Commissioning
IQ-, OQ- Support
LONZA Ltd - Switzerland | 2007
Fermentation, Harvesting & Downstreamprocessing for a microbial Multi- Purpose Plant (LSN)

-
Basic Engineering
LONZA Ltd - Switzerland | 2007
Large Scale & High throughput Microbial Production Plant (BMX)

-
Basic Engineering
Detail Engineering
Procurement
Erection (Supervision)
Commissioning
Qualification (IQ, OQ, Support)
LONZA Biotec sro - Czech Republic | 2007
Refit & Expansion for a Fermentation, Harvesting & Downstream Plant (ALT)
Project completion time: 18 months
The project in Kourim (Czech Republic) consisted of upgrading or expanding the production capacities of three buildings (F3, KUP15, and Premix).
Upstream- References
Projects 2004-Today


-
Detail Engineering
Procurement
Erection (Supervision)
Commissioning (Support)
Qualification (IQ, OQ)
ROCHE DIAGNOSTICS - Germany | 2006
HERCEPTIN PRODUCTION EXPANSION 254/10K - (H10)
Project completion time: 16 months
Delivery of a fermentation plant (H10). The production of herceptin required upgrading of the fermentation plant in Building 254.

-
Detail Engineering
Procurement
Erection (Supervision)
Commissioning
Qualification (IQ, OQ)
Roche Diagnostics - Germany | 2005
Dialysis Fermentation and Harvesting for Monoclonal Anitbodies - (DFA)
Project completion time: 19 months
This biotechnological production plant produces monoclonal antibodies for diagnostic purposes.

-
Detail Engineering
Procurement
Erection (Supervision)
Commissioning
Qualification (IQ, OQ)
Roche Diagnostics - Germany | 2004
Harvesting for a Fermentation Plant - (ERN)

-
Detail Engineering
Procurement (Support)
Commissioning
Qualification (IQ, OQ)
LONZA Ltd - Switzerland | 2004
Fermentation and Harvesting for a Multi- Purpose Plant - (BPM SS)
Project completion time: 13 months
We signed a contract for the design, construction, and startup of a microbial fermentation plant for Lonza at their Visp production facility.

-
Detail Engineering
Procurement
Erection (Supervision)
Baxter AG - Austria | 2004
Vaccine Produktion Facility Restart - (IM2)